Tuesday, February 6, 2018

Starting Portland

Finally getting to the lower level. I had three industries along the backdrop with space in between them. I put picture flats between them. These flats reminded me of the downtown area in Portland. I will probably put a few more trees in front of them, because they are not meant to be part of the industries just background.





Sunday, February 4, 2018

Katahdin

Katahdin got an extra track while I was working the area. The two tracks are for pulpwood and logs.


Thursday, February 1, 2018

Bangor Proper

Finally getting to the middle of the upper level. All previous work was on the two ends of the area to be covered.

 Front side of Jack Browns Barrels 

Backside of the barrel company.


The end of Main Street.

Start of the station and and building backdrops.


Sunday, January 21, 2018

More sawmill improvements

A little more work and some minor detailing 



Weathering happened along the way.

Thursday, January 18, 2018

Little more work in the country side.

You can see early asphalt work.



Then with a little more weathering


Bridge installed over the river

Tuesday, January 16, 2018

Making more trees

You can never have enough trees


Sunday, January 14, 2018

Working on the sawmill

Putting down the gravel base


Trying to decide if I should use the old logs or the newer bigger logs


The pond after several pours of envirotex lite.


The pond after logs placed.