Tuesday, April 12, 2022
Updates
Since the last update I have put down track about eight foot down the left slide and around the corner on both levels. I came back about six more feet on the lower level.
The backdrop is on for about 75% of the lower level. There is enough plywood to go halfway up the right side on the top level and all of the way up the lower level and back around the corner to the third leg.
Friday, April 8, 2022
Upper Level Looking Good
I had some help today from Kenny M. and we got in 24' of upper level bench work and 16' of backdrop for the lower level.
More importantly we had a great chance to discuss my thoughts of where to go from here. He had some good ideas and thinks to think about that maybe would help the people flow. We got the basics about getting the transition to the true upper level and possibly some small branch lines. More on that later as we get farther along
Saturday, April 2, 2022
Stud Wall and Helix/Loop
The current progress shows a good portion of a stud wall which will hold the second level.
The single loop up to get to the proper height for the second level.
Wednesday, March 30, 2022
Rounding the Corner
Rounding the corner into the second bench. The idea here is to convert the upper section into a true upper level the rest of the way. The upper section will do a loop and be far enough above the lower level for this to work.
Monday, March 28, 2022
Wednesday, March 9, 2022
Things Are Looking Up
The drop ceiling grids are in. Most of the lights are in and the rest will be tomorrow. Still working on getting the heating vents moved. Then all of the ceiling tiles will go in.
In the mean time I built 19 more feet of bench work and installed those plus 16' more. So the bench work away from the wall comes almost all the way back to the other side. One 8' section left to do and then work my way back up the other side. Two of those are already built.
The real trick will be figuring out whether or not I can transition to a real upper deck or not. It will require me to connect to the joists for stability. Time will tell.
In the mean time I built 19 more feet of bench work and installed those plus 16' more. So the bench work away from the wall comes almost all the way back to the other side. One 8' section left to do and then work my way back up the other side. Two of those are already built.
The real trick will be figuring out whether or not I can transition to a real upper deck or not. It will require me to connect to the joists for stability. Time will tell.
For those that knew the old layout, the ceilings are much closer to normal.
Wednesday, March 2, 2022
Progress again
The other construction is winding down. The train room is available for trains again. So now the ceiling tile grid is in. Next steps is to do some electrical and get a few heating ducts moved. The good news is I can work around that.