Saturday, March 11, 2023
The Woes of Inactivity
The helix area needed some mods to the turnout throws and some leveling. Hopefully this will work in the short term, but a change will have to happen to make it right. I just need to figure out what that is. Belfast might end up not having a passing siding. This could eliminate two turnouts. OR it could be a shorter siding that could work for a runaround but not much else. The only change for the only industry would be to make sure deliveries come from the same direction.
Chuck
Wednesday, March 1, 2023
Portland So Far
A little overview of Portland, ME. The first pic is the Swing gate while closed
Now you can see the Open Swing gate .
The first industry you come to is Dragon Cement. It will hold 4 cement hoppers on on track and 2 boxcars on the other track.
In the back you can Ice Plant #1. This can hold 5 reefers. It was recently in Brunswick but I could only fit in the racks and not the building. The two front tracks are Terminal #2 and #3. One is for bulk loading and the other will hold boxcars. Each is expected to hold 3 cars.
Next we have JB Browns Barrels in the back. It will have 2-3 spots. In the front there is a warehouse. It will hold two cars per track.
Finally we have the Maine Port Authority and another shipper. This will be 2-3 cars. The track in the front going nowhere is the connection to the barge and yard. The barge holds 12-15. The yard will be slightly bigger.
Wednesday, February 15, 2023
Portland Manual Control or not
There will also be a couple of tortoises used to stop a train if the bridge is open. With that the requirement for Computer nodes will be low.
I am considering having the whole area in manual control since it will be dark anyway. So if anyone out there has an opinion (especially if you new the old layout) let me know.
If I go with electronics it would require two control panels, two I/O nodes, some detection for the DS (if necessary), all of this I already have, so the only cost would be the extra wires needed (not an issue). So basically it is having a section completely manual where the rest of the layout is all on the computer.
Any thoughts?
Chuck
Monday, February 13, 2023
Swing gate is done
The lock can easily be reached as you can imagine on the left side where it has the O & C at the facia. There will be a micro switch placed on the right side so that when the gate opens, a tortoise on either side of the bridge will push a wire up between the tracks so no trains can do the vertical drop.
The table top of Portland has 16 feet installed with to be installed tomorrow. Conservative estimates put this addition at about 35 car spots
Friday, February 10, 2023
Lower Benchwork Nearing Completion
Wednesday, February 8, 2023
Working on the Swing Gate
So far the tolerances are too tight to swing properly. It pushes straight out fine, but is too tall and narrow to be left free standing. So there will be some adjustments to the swing coming.
The bottom picture gives you an idea of what the isle would be like when the gate is open.
Monday, February 6, 2023
Finally back to work
I will also have to figure out exactly where those cabinets will end up.
