Thursday, February 29, 2024

Rest of the updates

In all cases the track is in mechanically but not electronically at this time. I also have to make and wire up the local control panels. All of the turnouts are operable at the computer. Then I have to make step stools for short people. Redo and add waybills and rolling stock and then I can add the industries to the operating session.
The only place left is a logging branch off Acadia.

Acadia Updates

Acadia. 5 industries 20 spots. The saw mill went here. More work for the Wood Job and milk train.
Ignore the batteries they are weighing down an area that needed a glue up.


Bangor Updates

Bangor with 4 industries and 12 spots. I have more for the milk train and I can bring back piggyback service

 

 

 



Chuck

Katahdin Updates

Katahdin with the logging siding installed. Two tracks eight spots. Now the Wood job will have more to do.



Tuesday, February 13, 2024

The new staging is now in operation.

We had a session today and any train going to NMJ went all the way to the new staging. After the session was over the two trains that didn't run got put into reverse and backed all the way to the new staging.
Then I tore out the old staging and put in the cork to reconnect the town. The town's new identity is Acadia.
Now I have a little over week before the next session to get Acadia in service. Mainline only for now.