Wednesday, March 30, 2022

Rounding the Corner

Rounding the corner into the second bench. The idea here is to convert the upper section into a true upper level the rest of the way. The upper section will do a loop and be far enough above the lower level for this to work.


Monday, March 28, 2022

Ceiling is done

I think I am finally out of excuses and now I must go full steam ahead with the railroad. 


Wednesday, March 9, 2022

Things Are Looking Up

The drop ceiling grids are in. Most of the lights are in and the rest will be tomorrow. Still working on getting the heating vents moved. Then all of the ceiling tiles will go in.

In the mean time I built 19 more feet of bench work and installed those plus 16' more. So the bench work away from the wall comes almost all the way back to the other side. One 8' section left to do and then work my way back up the other side. Two of those are already built.

The real trick will be figuring out whether or not I can transition to a real upper deck or not. It will require me to connect to the joists for stability. Time will tell.

For those that knew the old layout, the ceilings are much closer to normal.

Wednesday, March 2, 2022

Progress again

The other construction is winding down. The train room is available for trains again. So now the ceiling tile grid is in. Next steps is to do some electrical and get a few heating ducts moved. The good news is I can work around that.