The drop ceiling grids are in. Most of the lights are in and the rest will be tomorrow. Still working on getting the heating vents moved. Then all of the ceiling tiles will go in.

In the mean time I built 19 more feet of bench work and installed those plus 16' more. So the bench work away from the wall comes almost all the way back to the other side. One 8' section left to do and then work my way back up the other side. Two of those are already built.

The real trick will be figuring out whether or not I can transition to a real upper deck or not. It will require me to connect to the joists for stability. Time will tell.