Wednesday, September 2, 2009

Room Changes

There was a water heater that was hooked up but not used in the train room. It had been isolated for many years. Today it was taken out. Removing the water heater freed up the area where the staging leads were to be for the upper and lower staging. This also freed up the power that was used for the water heater and gives me two more 120 volt power sources.
I also had a leaking outdoor faucet that needed to be replaced and it came through the layout area. It was also replaced. The water faucet would have caused problems for the layout if I waited and had to change it out later, because that line would have been behind the layout backdrop.
Now I have to figure out how to install a drop ceiling before continuing on the layout phase two.

No comments:

Post a Comment