Saturday, February 27, 2010

Good Progress

I had been putting off a few things like moving the sprinkler system control box, adding more overhead lights and power for the lights for the lower level and power for accessories. I finally just had to get the job done.
Moving the sprinkler box was not a big deal. The biggest decision was trying to figure out where to put switches to control the power under the layout. The easiest was to put a light switch nearest to the receptacles. This would have meant squeezing into a place behind the layout to turn off power. The hardest and most expensive was to put a switch near the entrance to the room. I agonized about this for awhile and I decided that the switch by the door would make the most sense after all the work was over.
I also added the power for what I believe are the last of the overhead lights. The light level looks pretty good now. I'm sure I'll have to adjust slightly as the rest of the benchwork is completed.
All in all good progress was made today.