Friday, March 19, 2010

Upper level return loop

I put the upper level return loop benchwork in place today. It matches the benchwork from the lower level.
I wasn't sure if I could get the supports needed to hold up the upper level and still be able to scenic the pond on the lower level. It looks like that will not be a problem. The next step will be t build the curved roadbed for the track.

No comments:

Post a Comment