Monday, May 3, 2010

Tortoise Machine update

I have been slack in working on the layout. Traveling this summer will keep me away quite a bit, so this may push back the operating timeline. The good news is I installed 20 tortoise machines today. That brings me up to 36 installed and roughly 79 to go.
All the turnouts in lower staging, mid staging and the town of Belfast, which has the wye leading to mid staging are complete. The town of Bath is mostly done and the town of Cumberland is half done.
There are about 27 to go on the lower level, most of which is in Portland. I am contemplating a change in the South end of Cumberland before I put the tortoise machines in. I'll worry about that when I get Portland done.

No comments:

Post a Comment