Sunday, July 4, 2010

Tough Progress

It took awhile but all the turnouts on the lower level are powered and operable from the computer/dispatchers panel. It took a lot of effort to get the last TSM's installed because I had to modify some of the supports under the benchwork.
I had some problems with the circuit boards (I think). Sometimes I'm not sure what is happening. I eventually got it all working today.
Once I get the blocks cut and powered up I will be able to run from Boston to St. Albans (lower staging to mid staging). That is essentially half of the railroad.