Wednesday, August 4, 2010

Connecting up the power

There aren't any pictures when you spend most of the time under the benchwork. I connected all the drops and put in occupancy detection for all of the lower level staging yards. I then proceeded to run the power district for the next section of track. With the exception of cutting the tortoise throw bars down to size, both staging yards should be ready for actual running/testing of trains.

I also finished the third control panel All three are running correctly.

No comments:

Post a Comment