Thursday, December 26, 2013

Update finally

It's been a long time since I posted so this will have to be a quick catch up. Facebook has been getting the most updates, with the web page coming in second.

This year has been mostly an electrical year. The mainline between the two end staging yards is completely signaled and under full CTC control. 80% of the rolling stock has resistor wheelsets installed, so the dispatcher has a much easier time watching trains on the computer screen

A new phone system was built and installed, based on the write up in the OpSig magazine. The room is much quieter now.

I'm now working on learning JMRI so that I will eventually be able to upgrade to newer computers. If all goes well the dispatcher will be able to dispatch up stairs on a MAC.

Oh yeah, I did do some scenery along the way.

No comments:

Post a Comment