Thursday, September 23, 2021

Paper Mill Progress


The paper mill track work is 95% complete.  Power will come next. For those of you that saw the last layout. There is more space and a few more spots than the last time. Included this time is a smal yard for storage. We might even be able to have a full time operator at the mill.


The first picture shows the mainline from the south. You will see the yard lead and the power plant.

Then you come upon the warehouse and the south end of the yard. Along with the Main and passing siding.

Now you see the Kraft Mill and the tank dock after that.

Next you will see the double tracks for the pulpwood and wood chips. There is also a short track to hold and engine and a caboose. 