I am now in the building stage for the new railroad. Some of the layout has been designed, but not all of it. The benchwork for phase 1 is done. The is mainline track down and powered up. One town has all of the sidings installed. I even ran an engine all the way around.
We will run using Digitrax. I have 15 engines with DCC decoders right now and one of those has Tsunami sound. I have a couple more that will receive sound.
Pictures will have to wait until I clean up a little.
Latest at Smith Summit
11 years ago
No comments:
Post a Comment