Thursday, May 28, 2009

Passing Siding installed at Rigby Yard

I also installed the leads into the yard. This time there will be better access to the arrival/departure track from the yard lead than there was the last time. The last time you had to pull out onto the main with the yard engine to get the cars to the arrival/departure tracks. This time the yard engine goes straight from the yard lead to the appropriate track.

No comments:

Post a Comment