Wednesday, June 17, 2009

Passenger tracks, Coach Yard and REA track

The north end of Portland now has a passenger siding that will hold 3 85' cars. Behind this track is a coach yard that will hold 6 cars total on the two tracks. Behind it is a track for the REA building. This track should hold four cars.

On the center left of the picture is track temporarily laid out to see where the industry tracks will be. My original plan had these two areas off the same lead, however I stretched the total yard length which gave me room to separate these two areas.

No comments:

Post a Comment