Wednesday, April 20, 2022

Bath Control Panel installed

The Bath Control panel has been installed and tested. The buttons and lights are working with the computer. I programmed the routes needed for each button. The next step will be the logic for what happens when you push the button. I just ran out of time.

I also started on the River section with two bridge section when leaving Bath. I am trying to do this now instead of later like I did with the last layout.

No comments:

Post a Comment