Saturday, April 16, 2022

Bath is Operational and further down the road

Bath has been been completed as far as track work and all of the connections to the computer. The next step is to put in the local control panel so I can test everything out.

Just past Bath is and area of about 20 linear feet. No towns are planned for here so I can increase the distance between towns, which was not something I had the last time. Since I'm modeling Maine I need more water, again something I didn't do as good the last time, I need more water. The first 8' section will just have a River and two bridges. This seems very weird and a waste of space. I have to remember that my plan was more distance between towns. I should be able to show something soon.

Chuck

No comments:

Post a Comment