Saturday, May 7, 2022

Local panels

In case anyone was interested in what my local panels look like under each section of the layout. I have presided what I could before I put it in place.. 
The upper left board will be used for all the push buttons and lights on the local control panel. The upper right is where the Tortoise machines, signals and Occupancy Detectors will connect. 
The middle is the PSX circuit breaker. The bottom is the actual detection to each block.
This is for only one half of the main yard. 


Thursday, May 5, 2022

Yard is coming Along

The main yard is making progress. You can see the Main, Passing and A/D tracks on the right and the first four yard tracks on the left. The turnout in the middle will lead to the other yard tracks and industrial area.the one the closest to the bottom of the photo will lead to the engine facility.


Saturday, April 30, 2022

Coming around the bend

Today was a Good day. I put in 16' of upper bench work, 24' of lower backdrop, 24' of lower plywood and 6' of cork. I just about have the plan for the next yard nailed down.
There is enough plywood down now that I can do all of the next yard.

Friday, April 29, 2022

Main Yards update

Here is the current idea for the main yard. Sometimes called Portland, sometimes Brunswick. Either way the main reason for the changes was that maybe I could have an aisle with a swing gate instead of something that you could not get past. The swing gate would be the lower right section, leading to a port/wharf area on the lower area. On the upper level maybe some of the sawmill/logging area. We will see how that plays out.
Have you have any opinions on this plan, let me know.

Wednesday, April 20, 2022

Bath Control Panel installed

The Bath Control panel has been installed and tested. The buttons and lights are working with the computer. I programmed the routes needed for each button. The next step will be the logic for what happens when you push the button. I just ran out of time.

I also started on the River section with two bridge section when leaving Bath. I am trying to do this now instead of later like I did with the last layout.

Saturday, April 16, 2022

Bath is Operational and further down the road

Bath has been been completed as far as track work and all of the connections to the computer. The next step is to put in the local control panel so I can test everything out.

Just past Bath is and area of about 20 linear feet. No towns are planned for here so I can increase the distance between towns, which was not something I had the last time. Since I'm modeling Maine I need more water, again something I didn't do as good the last time, I need more water. The first 8' section will just have a River and two bridges. This seems very weird and a waste of space. I have to remember that my plan was more distance between towns. I should be able to show something soon.

Chuck

Tuesday, April 12, 2022

Updates


Since the last update I have put down track about eight foot down the left slide and around the corner on both levels. I came back about six more feet on the lower level. 

The backdrop is on for about 75% of the lower level. There is enough plywood to go halfway up the right side on the top level and all of the way up the lower level and back around the corner to the third leg.