Thursday, April 28, 2011

Mainline track in Orrington


I finally got back to the layout after a nice vacation, but it is now time for the push to Bangor.

The sub roadbed has been completely connected throughout the whole empire. The mailine roadbed and track has been installed just past Orrington. The mainline turnouts are also installed. I'll need to work on the paper mill sidings next.


If you are familiar with the layout, that means the upper level track is now above Freeport. There is only one town left to go and it is just a single siding off of the mainline




The second picture shows the end of the installed mainline in the lower right corner. Just to the left of the box in the background is where the last siding needs to go.and to the left of this is where staging is located. The staging tracks are already installed.

No comments:

Post a Comment