The track arrangement for White Mountain Paper. I was able to add two sidings more than the old layout had. I have separate sidings for tank cars and covered hoppers. This used to be a single siding before. I also added a siding for the power plant so for the first time coal will be delivered to the paper mill.
The coal track is in the foreground and could support 4 hoppers. Next up and going into and next to the building will be the warehouse tracks. Each track can hold 3 cars.






Behind the Warehouse will be the Kraft Mill. It can hold 2 covered hoppers. Right next to the tanks will be the tank dock unloading. 2 cars can be spotted there. In the middle is the pulp tracks and 2 cars can unload there. Finally going around to the right behind the main line is the wood chip track. This track can hold three to four cars.




You'll notice some space in the foreground. This may be a small holding yard for the papper mill. We'll have to see how this goes, before I decide to put it in.