Sunday, May 1, 2011

All Switches in Orrington Operational

All of the tortoise machines are installed in Orrington and working from the computer. I guess it is time to catch up on the local control panels, or maybe I'll finish installing the mainline. What to do? What to do?
If I get all the way to staging I can add more trains and the dispatcher can control the upper level mainline. However, there won't be any switching from the two major towns on the upper level until I get a local control panel.
I guess I'll figure it out by Wednesday when I start the next batch of construction.

1 comment:

  1. Ok. So I had a little time and I couldn't resist adding cork roadbed all the way to staging. The Golden Spike was ordered so it would be ready when needed

    ReplyDelete