All of these turnouts are the newer Walthers turnouts and one PECO. They all have a spring to hold the turnout in place. The good news on this is that I can operate them without tortoises for now. The holes for the throw has been drilled for each turnout.
It is time to go back and wire all of the area and Portland Yard. Then start testing of all the trackage.
Now there is more than enough track laid down to support operations, with 21 staging tracks, two yards and four other towns.
No comments:
Post a Comment