Friday, December 15, 2023

A push towards finishing the benchwork

I’m making a push to have all of the benchwork in before Christmas. The following is the area above the engine facility. This is where we start the final track work for the upper level.

The rest of the photos show the last major sections which will go in place this week with some help.

These go along two different walls and the corner piece to connect them will be built after the actual dimensions are known.

 There is already about 40 feet installed, not counting the area over the turntable. All in all about 85 more feet of mainline will be put in. This will include a new 12 track staging yard and 2 new towns. The old staging yard will become another town with a logging branch off of it.