Friday, December 29, 2023

Updates with no pictures

So I have been making progress and trying to keep the railroad ready for an Op Session. These two things together are always a tough situation.
Facia has been installed from the New NMJ to the nod under.
Roadbed has been installed all the way to the right side of Brunswick. The middle of what is now Katahdin.
If I didn't mention it before, the mainline track and passing sidings are installed through Bangor.
After the next session there will be a major redo of the track under Searsport. Not looking forward to it, but it will make life easier in the long term.

No comments:

Post a Comment