Thursday, January 11, 2024

Day 3 Connecting the Mainline

The mainline from Belfast to Wiscasset is back in place. There were some mainline and siding adjustments. I think the Mainline looks cleaner than it did before. Wiscasset passing abilities will be a little shorter unless extend the track on the other end. Right now I am talking just the track work, not all the power and other controls.

1 comment:

  1. I agree, the mainline does look a lot cleaner. Always wondered about that S curve. Great job! K

    ReplyDelete