Tuesday, January 30, 2024

Getting Closer to using the new section

I have been installing signals until I ran out of signal's. I do have four on order that will complete everything from NMJ to the north side of Acadia. When I finally get the new staging open then I will modify Acadia and at that point I will need 4 or 5 more signals to finish.
In the near term all this will mean is a longer run on the upper level until I can get something industries put in. The turnouts are there so maybe it won't take too long.

Also my repair parts came in for my occupancy detectors and they are now repaired which makes all of my NMJ staging tracks available.

Now I have to make NMJ a little bit longer to fit all of the trains AND then I can open things up.

No comments:

Post a Comment