Monday, January 22, 2024

Picture Time

The mainline is in except for one spot. I should be able to get to that in a day or so. I started wiring the track up today.

Below you will see the loop above the roundhouse. Old NMJ is on the left. The town will be Acadia when finished. The sawmill will be inside the loop. Northern Maine Junction is left of the clock and heading back to the right.

Working our way towards the new NMJ. This picture shows where the covered bridge will be the one holdout for having the mainline done.

Working our way towards Katahdin.

The lumber town o Katahdin will get a double track this time. It will help with traffic and allow me to use my double track bridges

The spur for the logging siding.

Katahdin on the right and Bangor on the left and the nod under (about 5’ 1”)

Bangor with the turnouts already installed. Down at the end and around the corner is Northern Maine Junction.

No comments:

Post a Comment