Friday, November 6, 2009

Benchwork connected

I didn't get much benchwork done today, however I did get the phase 1 & 2 sections connected. I now have approximately 100 feet of continuous benchwork on both the upper and lower levels. The upper and lower levels are not connected yet. That is coming later.
I did remove the temporary staging yard so that I could get the benchwork connected. I will need a little more bracing to stabilize the benchwork.
A couple of choices I have for the next job will be the studs and the benchwork for the staging yard. The other choice would be to put a little road work in to see if the benchwork height will be right. That will help to ensure that the staging height will be right when I get there.