Sunday, November 22, 2009

Connection between the two levels

I put in the benchwork for the lower level and decided to start to put up the upper level to see how the transition was going to work. I was making all of these measurements and settled on where the upper level needed to go. It is a little too high for a yard that may go in this locations. I started looking around and realized I was getting ahead of myself.

I looked up toward the ceiling and I remembered the ceiling needed to go in first. If I put the benchwork in before the ceiling, it would be very hard to get to the ceiling. So the benchwork will have to wait and the ceiling is at the top of the list.

This will allow me time to think about where to connect to the rest of the benchwork.