Saturday, November 28, 2009

Things are going slow

The ceiling in the second section is progressing, slowing. I got most of it installed around the helix area and then I ran into another bottleneck. There is a transition that is causing me fits. I trying to build covers for some of the duct work to minimize the elevation change of the ceiling. The transitions are all different and must come together some way. I'm working out the details. I'm just slow.

No comments:

Post a Comment