Friday, December 4, 2009

Ceiling is progressing & Code change

The ceiling is coming along and it won't be long before I can divert my attention to laying track. Speaking of track, I have decided to change to code 83 except for hidden track and staging.
I ordered a lot of flextrack and cork roadbed. I also ordered a pile of turnouts. I also snuck in a F3A/B unit with sound. The turnouts arrived today. The track should be here by the time I'm ready to go.

No comments:

Post a Comment